High Quality Cryogenic LNG Storage Tank for Sale

- USD 35500.00 /Unit
- 1 Unit
- 81 Unit
- 24 days
Product Description

Plate Bending Machine | W11 | 4 | 3.0 | Acceptable |
Submerged Arc Machine | MZ-1000 | 4 | 2.0 | Acceptable |
Welding Machine | NBC-500 | 50 | 3.0 | Acceptable |
Chamfering Machine | BBJ-12 | 1 | 3.0 | Acceptable |
Drilling Machine 1 | ZQ3080 | 5 | 3.0 | Acceptable |
Lathe 1 | CW61100 | 1 | 3.0 | Acceptable |
Small Vertical Lathe | C512A | 2 | 3.0 | Acceptable |
Large Vertical Lathe | CY5112 | 1 | 2.0 | Acceptable |
Lathe 2 | CQ5250-Y | 1 | 2.0 | Acceptable |
Drilling Machine 2 | GXK2020BU | 1 | 2.0 | Acceptable |
Thread Rolling Machine | Z28-100 | 1 | 2.0 | Acceptable |
Resistance Furnace | RT | 1 | 3.0 | Acceptable |
Shearing Machine | QC12Y | 1 | 3.0 | Acceptable |
Grinding Machine | M1332B | 2 | 3.0 | Acceptable |
Milling Machine | X50A | 5 | 3.0 | Acceptable |
Testing Machinery:
Machine Name | Brand & Model No. | Quantity | Number of Year(s) Used | Condition |
Micrometer | 500-600mm | 5 | 3.0 | Acceptable |
Universal Testing Machine | WE-60 | 1 | 3.0 | Acceptable |
Constant Temperature Drying Oven | 101 | 1 | 3.0 | Acceptable |
Vernier Caliper | 100cm | 10 | 2.0 | Acceptable |
Box-type Resistance Furnace | SX2 | 1 | 3.0 | Acceptable |
Photometer | 72 | 1 | 3.0 | Acceptable |
Impact Testing Machine | JB-300B | 1 | 2.0 | Acceptable |

PRODUCTION PROCESS OF STORAGE TANKS
1). cutting materials
2). rolling machines for circling
3). welding and NDT inspection
4). re-circling after welding
5). outer vessel's abrasive blasting and anticorrosive painting for outside surface
6). pipe connecting and assembly of inner vessel and outer vessel
7). valves installation
8). perlite filling
9). vacuum-pumping
10). final painting and ready for shipment
Product Images
