Dongfeng Truck Relay Valve 3527z26-010

  • Dongfeng Truck Relay Valve 3527z26-010
  • USD 25.26 /Unit
  • 1 Unit
  • 34 Unit
  • 20 days
Product Description
Scope of application: king prince special assembly - king prince braking system,08 hoka- braking system,
Associated parts: brake hose, air cylinder, brake air chamber
Installation location: behind the frame
Principles: the principle when on the brake pedal, brake valve's output pressure as the pressure in the working principle of the relay valve control input, under the effect of control pressure, the inlet valve will open, then the compressed air directly by the air cylinder through the air inlet into the brake chamber, rather than through the brake valve, brake chamber which greatly shortens the aeration pipe, accelerate the air chamber aeration process. When the foot pedal to loosen, the control pressure, after removal of diaphragm in the spring under the action of arch, down to close the inlet valve, exhaust valve open, then compressed air brake chamber by the core tube and hole to brake valve, and the brake valve vent discharge into the atmosphere.
Common faults: (a) the common breakdown of the rear wheel main brake doesn't work cause analysis (relay valve jammed in the upper limit position (common faults in the rear wheel (2) the main brake don't contact for root cause analysis (relay valve live he died in the lower limit position (3) of the common breakdown, rear wheel brake Lord insufficient braking force analysis of the causes of relay valve exhaust valve leakage



Do<em></em>ngfeng Truck Relay Valve 3527z26-010
Do<em></em>ngfeng Truck Relay Valve 3527z26-010
Do<em></em>ngfeng Truck Relay Valve 3527z26-010




FAQ
Minimum order quantity?
MOQ is 1unit.
Productionperiod?
(Truck &trailer)Within 30-55days since the moment we got your down payment.
(Spare Parts)Within 3-10days since the moment we got your down payment. Besidesin large quantities or imported
Payment term?
TT:100%T/T should be paid before delivery
(Truck &trailer)30%T/T as deposit, the balance should be paid before delivery. or L/C.
(Spare Parts)large quantities: 50%T/T as deposit, the balance should be paid before delivery, OrLC,Western union
Shipping?
(Truck &trailer)
by container or RoRo/Bulk shipment. (South America,Middle East, Africa, Oceania etc.)
by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan ,Vietnam, Laos etc.)

(Spare Parts)Air transportation, such asDHL, TNT, UPS, or Fedex.
Large value or Large quantity of goods, by sea or LCL
After payment
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend).
We will take photos for you to confirm before the delivery, and then delivery to you





Do<em></em>ngfeng Truck Relay Valve 3527z26-010





Do<em></em>ngfeng Truck Relay Valve 3527z26-010

Basic Info Model NO. 3527Z26-010 Trademark SINOTRUK Specification standard size Origin China HS Code 8708999990 Product Description Customer Question & Answer Ask something for more details (0) Scope of application: king prince special assembly - king prince braking system,08 hoka- braking system,
Associated parts: brake hose, air cylinder, brake air chamber
Installation location: behind the frame
Principles: the principle when on the brake pedal, brake valve's output pressure as the pressure in the working principle of the relay valve control input, under the effect of control pressure, the inlet valve will open, then the compressed air directly by the air cylinder through the air inlet into the brake chamber, rather than through the brake valve, brake chamber which greatly shortens the aeration pipe, accelerate the air chamber aeration process. When the foot pedal to loosen, the control pressure, after removal of diaphragm in the spring under the action of arch, down to close the inlet valve, exhaust valve open, then compressed air brake chamber by the core tube and hole to brake valve, and the brake valve vent discharge into the atmosphere.
Common faults: (a) the common breakdown of the rear wheel main brake doesn't work cause analysis (relay valve jammed in the upper limit position (common faults in the rear wheel (2) the main brake don't contact for root cause analysis (relay valve live he died in the lower limit position (3) of the common breakdown, rear wheel brake Lord insufficient braking force analysis of the causes of relay valve exhaust valve leakage



Do<em></em>ngfeng Truck Relay Valve 3527z26-010
Do<em></em>ngfeng Truck Relay Valve 3527z26-010
Do<em></em>ngfeng Truck Relay Valve 3527z26-010




FAQ
Minimum order quantity?
MOQ is 1unit.
Productionperiod?
(Truck &trailer)Within 30-55days since the moment we got your down payment.
(Spare Parts)Within 3-10days since the moment we got your down payment. Besidesin large quantities or imported
Payment term?
TT:100%T/T should be paid before delivery
(Truck &trailer)30%T/T as deposit, the balance should be paid before delivery. or L/C.
(Spare Parts)large quantities: 50%T/T as deposit, the balance should be paid before delivery, OrLC,Western union
Shipping?
(Truck &trailer)
by container or RoRo/Bulk shipment. (South America,Middle East, Africa, Oceania etc.)
by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan ,Vietnam, Laos etc.)

(Spare Parts)Air transportation, such asDHL, TNT, UPS, or Fedex.
Large value or Large quantity of goods, by sea or LCL
After payment
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend).
We will take photos for you to confirm before the delivery, and then delivery to you





Do<em></em>ngfeng Truck Relay Valve 3527z26-010





Do<em></em>ngfeng Truck Relay Valve 3527z26-010

Product Images
Dongfeng Truck Relay Valve 3527z26-010 Images 1
Factory Show

   China Truck International Ltd. Is a refitted truck base of CNHTC in Jinan integrating R&D, production and sales of various special-purpose vehicles.

  Jinan Special Vehicle company predecessor-Jinan Garden Machinery Works was the domestic largest manufacturer of sprinklers at the earliest time, and was incorporated into CNHTC in 2005, removed to CNHTC Zhangqiu Industrial Park in 2007 and renamed as CNHTC Jinan Special-purpose Vehicle Co., Ltd. In 2007, and removed to the new factory at No. 17668, Panwang Road, Zhangqiu, Jinan in November 2010. The new factory covers an area of 360mu and a building area of 42, 000m2, and has 360 sets of various advanced equipment, and a staff of over 600 people including more than 60 professionals. Now, the company can yield 7, 000 dumpers and van vehicles and 3000 tank trucks annually, and will realize an annual production capacity of 15, 000 refitted vehicles in 2012.

Customer Visit

 

Our Services

 

Packaging & Shipping

 

Get the latest price? We'll respond as soon as possible(within 12 hours)
close left right