Cost Effective Front End 1.8m3 Construction Lw300fn Wheel Loader

  • Cost Effective Front End 1.8m3 Construction Lw300fn Wheel Loader
  • USD 35600.50 /Unit
  • 1 Unit
  • 92 Unit
  • 22 days
Product Description
cost effective 1.8m3 construction LW300FN Wheel Loader

Contact way:
Sales Manager
Alisa Wang

Newindu E-Commerce (Shanghai) Co.,Ltd.
Add: Suite 1326, Fortune Times Tower, No. 1438 North Shanxi Road, Shanghai, China
Tel: +86-21-62770109Fax: +86-21-62120109
Mobile +86-18616224775

Web: www.evangelchina.com

Product Description:

cost effective 1.8m3 construction LW300FN Wheel Loader

ItemSpecificationUnit
Rated operating load3000kg
Bucket capacity1.5~2.5
Machine weight10600±200kg
Dump clearance at maximum lift2770~3260mm
Reach at maximum lift1010~1210mm
Wheel base2600mm
Tread1850mm
Height of hinge at maximum lift height3830mm
Working height(fully lifted)4870mm
Max.breakout force130kN
Max.horse power95kN
Hydraulic cycle time-raise5.5s
Total hydraulic cycle time10s
Min. turning radius over tyres5165mm
Articulation angle35±1°
Gradeability28°
Tyre size17.5-25-12PR
Overall machine dimension L×W×H7050×2482×3118
ModelWP6G125E22
Emission standardsEmission 2
Rated Power/Speed92/2300kW/rpm
Fuel Tank170L
Hydraulic Tank170L
-gear(F/R)8/10km/h
-gear(F/R)13/30km/h
Travel speed-gear(F)24/-km/h
-gear(F)40/-km/h


Product image:

Cost Effective Front End 1.8m3 Co<em></em>nstruction Lw300fn Wheel Loader
Cost Effective Front End 1.8m3 Co<em></em>nstruction Lw300fn Wheel Loader
Cost Effective Front End 1.8m3 Co<em></em>nstruction Lw300fn Wheel Loader
Cost Effective Front End 1.8m3 Co<em></em>nstruction Lw300fn Wheel Loader
Cost Effective Front End 1.8m3 Co<em></em>nstruction Lw300fn Wheel Loader
Cost Effective Front End 1.8m3 Co<em></em>nstruction Lw300fn Wheel Loader








Product Images
Cost Effective Front End 1.8m3 Construction Lw300fn Wheel Loader Images 1
Get the latest price? We'll respond as soon as possible(within 12 hours)
close left right